Advisory work surfaces the same problems, project after project. Where those problems repeat and no adequate solution exists, we build one — targeted, not generalised. These tools extend the work we do with clients into their day-to-day operations.
Advisory Playground
The innovation-practice layer — a management system that gives ISO 56001 information flow somewhere to live, and an open database of what has actually been proven in the field. Both put structure under work that would otherwise rely on instinct.
Innovation management system for AEC. Structures the information flow that ISO 56001 requires — so that ideas, decisions, and outcomes are tracked in one place rather than scattered across inboxes and project folders. Includes a rapid maturity diagnostic that benchmarks your practice against the framework and surfaces the gap between stated intent and live work.
The design database that tells you what’s real. A public, curated catalogue of innovation across the built environment — products, solutions and projects scored for how proven they actually are, so teams can tell genuine capability from marketing.
Project Intelligence
Two tools focused on where decisions lock in — the project level. Built for AEC teams that want to validate assumptions and track R&D spend as work happens, not after the fact.
Project-level validation and tracking tool, delivered as a live plugin. Surfaces the assumptions embedded in your project data before they become constraints — giving concept-stage teams a structured view of what is known, what is assumed, and what is at risk.
R&D spend and activity tracking for AEC firms. Maps qualifying work against claim categories as projects progress — so the evidence for R&D Tax Credits is built in real time rather than reconstructed under pressure at year end.
Purpose-Built
Tools built because a specific client need kept repeating and no existing solution handled it well. Simple, intelligent responses to large, persistent problems.
Sustainability statement drafting at concept design, for London planning submissions. Structured around the GLA, UK, and Tower Hamlets policy frameworks — so the sustainability argument is built into the concept, not assembled in a hurry before submission.
Working on a problem that needs a tool like this?
Start a conversation →